A listing described as a screw capper is a starting point. Before comparing prices, identify the closure that will run on it and the bottle finish it must fit. A useful enquiry pairs a machine reference with drawings, samples and a clear account of the equipment included.
Separate the closure families
AROL presents plastic screw, aluminium ROPP and crown closures as distinct capping applications. Treat those descriptions as equipment families, then check the heads fitted to the actual machine. A manufacturer name or familiar model does not establish that the offered turret suits your closure.
| Closure in your project | Evidence to request |
|---|---|
| ROPP aluminium | Closure and bottle-finish drawings; fitted head identification |
| Pre-threaded screw | Cap samples; head or chuck specification; documented settings |
| Crown | Cap specification; bottle-finish drawing; installed tooling |
Send drawings before asking for a conversion price
State closure supplier, drawing revision, bottle material and finish reference. Add photographs of the current package and representative samples where practical. Ask the seller to identify what is confirmed, what needs an operating trial and which proposed changes still require the manufacturer or a competent specialist to review them.
Follow the cap from hopper to bottle
Include the elevator, orientator, chute and transfer arrangements in the quotation review. Request a photograph of each included element and a written list of exclusions. A compatible application head alone does not answer whether the supplied feeding equipment can handle your intended closure consistently.
Agree what a representative test must show
Ask for a run using the proposed bottle and closure, with the operating conditions recorded. Request the supplier's applicable package checks and acceptance criteria rather than imposing a universal torque or load value. Link the test record to the machine serial number, installed heads and samples used.
Turn uncertainty into a priced scope
Separate the base machine, tooling, feeding changes and any inspection work into quotation lines. Where compatibility remains unconfirmed, retain that point in the project brief. This makes a modest purchase price easier to compare with an offer that already includes the necessary format equipment.
Buying checklist
- Machine reference and serial plate
- Bottle and closure drawings with revision numbers
- Photographs identifying the installed heads
- Feeding equipment and change parts included
- Trial conditions and package acceptance criteria
- Written conversion scope for unresolved items